Green Trailway Complete for Nocatee Residents
The electric cart network that surrounds Nocatee is finished! It’s the first of its kind in Northeast Florida. Electric golf carts, or similar low-speed vehicles, can be used as an alternate form of transportation around the entire community. Connector roads have been built between communities and amenities to increase the network. This interlinked Greenway Trail System includes miles of wide, multiuse pathways that wonder between communities, shopping, wetlands, and recreation areas.
Special arrangements had to be agreed upon by St. Johns County to be able to operate electric carts on roadways. In order to accommodate the carts, the PARC Group had to install 25 mile per hour signs, “share the road” signage, and special parking at each of the amenities. Cart operators must have a valid driver’s license and the carts must have headlights, rear lights, and blinkers.

What Others Are Saying
Currently there are no comments. Feel free to add yours below.
Add Your Thoughts